ENERGY STORAGE | Pumped Storage Hydro (PSH), Batteries (BESS) etc
Other Infrastructure Projects & Related Information
These are the home websites connected to Infrastructure Projects and their associated Developers.
They contain maps, project information and timelines, also technical documents and data, etc.
Developer Websites
Red John Pumped Storage Hydro Scheme / Loch na Cathrach
Projects | Loch na Cathrach Pumped Storage Hydro – Statkraft UK
- ECU 00000728
- Status: Consented (07 Jun 2021)
- Construction start planned 2026
Loch Kemp Pumped Storage Hydro Scheme
- ECU 00003398
- Status: Application referred to DPEA (as of end of July 2025)
- Highland councillors oppose hydro project on Loch Ness – BBC News
- Scottish Government – Planning and Environmental Appeals Division (DPEA)
Glen Earrach Pumped Storage Hydro Scheme
https://www.glenearrach.energy
- ECU 00005121
- Status: Application submitted / under consideration (31 Mar 2025)
Pumped hydro storage and the environment
Save Loch Ness – Save Loch Ness
Save Loch Ness has been formed by a small number of local residents, business owners and loch users; out of concern for the potential impacts of the Glen Earrach Energy (GEE) proposal and the wider cumulative impacts of the multiple pumped storage hydro projects on Loch Ness.
