COMMUNITY CONSULTATION & EXHIBITION | FARR WIND FARM EXTENSION

COMMUNITY CONSULTATION & EXHIBITION | FARR WIND FARM EXTENSION

When

17 June 2026    
11:30 am - 6:30 pm

Where

Event Type

Loading Map....

COMMUNITY CONSULTATION EVENT | FARR WIND FARM EXTENSION & NADARA

FARR COMMUNITY HALL > 9.30AM TO 5PM ON TUE 16 JUNE 2026

STRATHDEARN HUB > 11.30AM TO 6.30PM ON WED 17 JUNE 2026

What’s proposed > Farr Wind Farm from 2030

Extracted from Nadara’s Website:

Farr Wind Farm is around 8 miles south of the city of Inverness and has enough capacity to power 20% of the homes in the Highlands. The current planning consent will expire in December 2030. As a result of assessment work which has been undertaken in relation to Nadara’s fleet of operational wind turbines and their ability to operate for longer than was originally envisaged, there is an opportunity for Farr Wind Farm to continue to generate clean electricity beyond the current consent expiry date.

At it stands > Farr Wind Farm in 2026

Extracted from Nadara’s Website:

Installed capacity 92 MW | Energy produced 252,253 MWh/year | CO2 reductions 113,009 t/year

How we calculate metrics for our sites in the UK > Nadara

Extracted from Nadara’s Website:

  • ‘Energy produced (MWh/year)’, ‘CO2 reductions (per year) in tonnes’ and ‘Homes Powered Equivalent’ data are calculations based on industry standard methodologies taken from https://www.renewableuk.com/energypulse/ukwed/
  • ‘Energy produced (MWh/year)’ is calculated by multiplying the installed capacity in MW by the number of hours in a year (8,760) and then multiplying this by DESNZ’s long-term average load factor for (onshore + offshore) wind (31.3%) expressed as a fraction of 1 (0.313).
  • ‘CO2 reductions (per year) in tonnes’ is calculated using DESNZ’s “all non-renewable fuels” emissions statistic of 448 tonnes of carbon dioxide per GWh of electricity supplied in the Digest of UK Energy Statistics (July 2025) Table 5.14 (“Estimated carbon dioxide emissions from electricity supplied”).
  • Carbon reduction is calculated by multiplying the total amount of electricity generated by wind per year by the number of tonnes of carbon which fossil fuels would have produced to generate the same amount of electricity.
  • ‘Homes Powered Equivalent’ is calculated using the most recent statistics from DESNZ showing that annual GB average domestic household consumption is 3,323kWh (as of December 2025, updated annually).
  • RenewableUK calculates homes powered as: number of megawatts installed, multiplied by DESNZ’s “all wind” (onshore + offshore) load factor expressed as a fraction of 1 (0.313), multiplied by number of hours in a year (8,760), divided by average annual domestic electricity consumption expressed in MWh (3.323). 
For more information on Nadara see Living energy | Nadara

Calendar

Mon
Tue
Wed
Thu
Fri
Sat
Sun
M
T
W
T
F
S
S
31
1
2
3
4
5
6
7
8
9
10
11
12
13
15
16
17
18
19
21
23
24
25
26
27
28
30
1
2
3
TONIGHT @ 7.30pm | Strathnairn Development Company | AGM
***TONIGHT*** Strathnairn Development Company | AGM | Members / Community Welcome Monday 30 March 2026 | Doors open at 7pm, for meeting start @ 7.30pm Reminder of tonight's AGM for Strathnairn Development Company at 7.30pm in Farr Community Hall. All members and Strathnairners welcome.
Loch Kemp Hearing sessions 14 & 15 April Wildside Centre
14 April 2026 - 15 April 2026    
12:00 am
Planning and Environmental Appeals Division  (DPEA) POWER STATION: LOCH KEMP STORAGE ELECTRICITY GENERATING STATION LAND 1300M SW OF DELL LODGE  WHITEBRIDGE IV2 6UN . The [...]
Deadline for registering to Vote in Scottish Parliament Election 
20 April 2026    
12:00 am - 11:45 pm
If not already in the system... Deadline for registering to Vote in Scottish Parliament Election on 7 May 2026  Register by 11:59pm on 20 April 2026 to vote in the following elections on 7 May 2026:
'South Loch Ness Roads Improvement Strategy' & Local Roads (B851)
20 April 2026    
7:00 pm - 7:30 pm
At the request of SNCC, HC's Colin Ross, Senior Road Engineer is confirmed as attending 0.5 hr session prior to SNCC Monthly Meeting, to brief the community on the above and take any questions or feedback from the community to inform strategic development & current plans.
Strathnairn Community Council (SCC) Monthly meeting
Strathnairn Community Council (SCC) | Monthly Meeting For all live community-wide business and local planning matters; acting as a link between the local community, the [...]
Drop-in/exchange with the SNCC Projects Team @ Community Cafe
22 April 2026    
10:30 am - 12:00 pm
No Categories
WE ARE CONFIRMED AS IN THIS WEEK > Ask away | Drop-in sessions to consult current documentation, exchange with or feed back directly to the [...]
Olivia Ross & Friends 29th April 7.30pm Strathnairn Hall Daviot
29 April 2026    
7:30 pm - 10:00 pm
29th April, 7.30pm Strathnairn Hall,Daviot, Inverness. £14 /£8 under 16s Tickets on the door or eventbrite.com.  Click here 29th Apr Olivia Ross A3 poster  
Events on 30 March 2026
Events on 22 April 2026